Metro Mining (MMI) provided an update for the June Q, with a minor downgrade to production. Atypical weather conditions and a delay in the delivery of new haulage equipment has resulted in a 3% reduction of FY19 guidance to 3.3-3.5Mwmt (previously 3.4-3.6Mwmt). Despite this downgrade, operations at Bauxite Hills are expected to ramp up rapidlyRead more
Argonaut | The Natural Choice in Resources.
© 2024 Argonaut.