WC8 continues to advance the Tabba Tabba pre-feasibility study (PFS), with key metallurgical test work released during the 3QFY25. Further test work is being undertaken to a definitive feasibility study level and should be released later this year. Drilling in the hanging wall pegmatites has confirmed additional mineralisation that should lower the overall strip ratio of the planned open pit. The release of the pre-feasibility study is expected to be released in July/August, with the subsequent definitive feasibility study likely to follow around nine months later. The release of these studies presents the key catalysts for WC8 in FY26.